Demirciler Weir and HEPP

Location: Denizli
Purpose: Energy
Weir Type: Electrically Controlled Gated
Total Design Discharge: 12.00 m³/s
Net Head: 79.68 m
Total Installed Power: 8.70 MWm / 8.44 MWe
Number of Units: 3 (2+1)
Turbine Type: Horizontal Axis Francis
Client: Akfen Holding

Other Projects