Dim Dam and HEPP

Location: Antalya
Purpose: Energy – Drinking Water – Irrigation – Flood Control
Body Height: 123.50 m
Body Volume: 4.800.000 m³
Reservoir Volume: 265.000 hm³
Irrigation Area: 5.312.00 ha
Installed Power: 38.25 MWe
Number of Units: 3
Turbine Type: Vertical Axis Francis
Net Head: 132.18 m
Total Discharge: 32.10 m³/s
Annual Energy Production: 122.89 GWh
Client: Diler Holding

Other Projects