Merkez Çevre Pond & Irrigation Network

Location: Uşak
Purpose: Irrigation
Body Type: Clay Core Sand + Gravel Fill
Body Height: 30.30 m
Crest Length: 179.57 m
Total Body Volume: 195300 m³
Spillway Capacity: 22.26 m³/s
Derivation Length: 215.31 m
Client: DSI – General Directorate of State Hydraulic Works

Other Projects