Merkez Karakuyu Pond & Irrigation Network

Location: Uşak
Purpose: Irrigation
Body Type: Clay Core Rockfill Dam
Body Height: 29.90 m
Crest Length: 195.47 m
Total Body Volume: 154350 m³
Spillway Capacity: 4.17 m³/s
Derivation Length: 196.86 m
Client: DSI – General Directorate of State Hydraulic Works

Other Projects